Geodesy, geology, topography from certified specialists Guild Engineering. We work in Ukraine


the Analysis of soil for construction, soil investigation

Before start of any construction process, it is necessary to conduct a series of preparatory work, which includes the analysis ground for construction. To know the detailed composition of the soil is simply necessary in order to determine next steps on the choice of construction method. Because on this depends the whole future destiny of a design, its durability and safety of the people it contains.

the Analysis of soil for construction, soil investigation

Produce analysis of soil for construction, the Foundation in this case we select the optimal shape and composition.

If to consider the geological causes of destruction of the only recently built homes, you can select the drawdown of soil, swelling, as well as the flooding of the basement. Drawdown may appear on any area, regardless of type, if there were mistakes during the construction process. Swelling and consequently the distortions of the destruction that can occur when the soil is frozen or if it is too watery.  basement Flooding can occur when incorrect waterproofing at the stage of laying the Foundation. In this case, the mold may and even destruction.

Get a free estimate of the cost of work geology for your object
Basic information about the object of research
Your name*
Phone or email

So none of these, and other equally dangerous problems  not touched your building, you need to perform detailed soil analysis to build a house. If you choose the wrong type of Foundation without prior study of the territory, it is quite possible that very soon you will notice a very ugly metamorphosis from the newly built house.

During the soil investigation for construction need to pay equal attention to the soil and groundwater. The easiest way to research ground for construction, which can be used to study small areas and small-scale buildings - drilling exploration  wells with sampling of undisturbed structure. For the simple case of (small-scale construction, relative to "tranquil relief) suitable for drilling two or three holes. The main thing that they were dug in different parts of the site, in order to have more accurate and complete picture. The drilling depth will allow you to take samples not only solid soil, and groundwater, which also need to study in detail. In the so-called problematic cases or if construction is planned large-or purpose - sharing or production activities, we have to drill deeper, and more. The number of wells increases, and in addition to lab tests added or research in nature, check the resistance of the soil on the slope, density and geopathic zones probing the soil.

in Addition to the study of underground reservoirs, it is necessary to pay attention and precipitation, which is most characteristic of the area. If they are too strong and frequent, it is necessary to calculate the possibility of floods and other natural disasters that can affect the structure. But as they say, forewarned is forearmed. With our company you will be aware of all the dangers and be able to simulate the construction process according to this information. Knowing the possible consequences, we can avoid many problematic situations, to protect them and to protect your home.

how much oboidetsa soil analysis depends on:

a species of ground;

- number of samples;

- the complexity of the plot.

Some try to save money by independently sampling and having personally delivered to the IC. But here we need to consider the following factor you need to know exactly how to produce a soil sample and with what depth without breaking the integrity of the soil. The result can be incorrect conclusions and decisions, which will affect the construction of the facility and its operation. Therefore it is better to trust the analysis of soil experienced specialists of the Engineering Guild.