Guild Engineering will perform geodetic marking works of any complexity, as well as marking works in the construction process, center work station,  when applying Foundation, erecting of brick buildings, while conducting geological exploration, construction pits, the installation of columns, steel structures, with the passage of ditches and trenches for foundations, on-site hydraulic structures quickly, qualitatively, with a guarantee of accuracy.

In engineering geodesy there are lots of activities and processes, both complex and individual. Marking works is one of the important procedures. Because with its help it is possible to determine the position of the key design points on the terrain regarding the project and drawings. In simple terms - is the transfer of the project in nature.

geodesic

Basis center works is the project. And he, in turn, is based on topographic maps. Future construction should be placed on the site is not chaotic, and with reference to existing objects, terrain and parts of the world.

We offer:

  • marking works in the construction process;
  • the center works on the platform of hydraulic structures;
  • center work station;
  • geodetic marking works;
  • marking works theodolite;
  • marking works when mounting columns;
  • marking works when carrying out geological exploration;
  • marking works during the construction of brick buildings;
  • marking works when applying Foundation;
  • marking works in the construction of pits;
  • center works with the passage of ditches and trenches for the foundations.

Price surveying 1 900 UAH for the object

the Basic principle of the center works that on the basis of cartographic materials and coordinate the project with maximum accuracy to determine the desired point on the plot. No measuring is not performed, only the actual transfer by delaying.

work breakdown due such a thing as an axis. These drawings are the positioner basic elements of design. There are several types of axes. Thus, the principal axes are longitudinal in nature, and is the main focus in determining the shape and parameters of the design. There is an intermediate axis, which define additional elements of the structure.

Before you can proceed with the breakdown, you must do some preparation, which involves the construction of center-based and determination of coordinates. Above the project also need to work to study graphic materials, to determine how to split. For greater accuracy and ease developed a special layout drawings, which are applied all the necessary elements. Marking works can be one of several methods. The choice of method in each case is individual and depends on the site itself, its location and characteristics of the geodetic network.

Marking works is a staged procedure. First of all, you need to determine placement on the terrain principal axes and principal. After these points are found and fixed, you can proceed to the second stage. It begins with the moment when you are working on the base of the structure, and involves the application of  all intermediate axes. It is intermediate axes it is necessary to pay special attention, because their accuracy depends on the accuracy of the location of each of the individual elements of the building. The error here is only allowed 2 mm, while the error for the first stage can reach 5 mm, But the maximum accuracy is important at the final stage, when is the breakdown for the process equipment. To check the correctness and accuracy will help Executive survey. Diagram with the results of the survey attached to the Act center of the work, which shall be made upon the completion of the procedure.

Geodesic breakdown is an important stage of construction, which should be trusted only to professionals. You can't go wrong if you choose us. Experience, competence and professional equipment - these are the components of a successful center.

Full list center works:

  • geodetic marking works;
  • marking works when applying Foundation;
  • marking works during the construction brick buildings;
  • marking works when carrying out geological exploration;
  • marking works in the construction of pits;
  • marking works when mounting columns;
  • center works with the passage of ditches and trenches for foundations;
  • marking works in the construction process;
  • marking works on site waterworks;
  • marking works total station, theodolite, level and any other surveying instrument