Geodesy, geology, topography from certified specialists Guild Engineering. We work in Ukraine


Survey, topographic survey, costs of surveying

Issues of interest to all customers:
1."What will I get with you the topographical map?"
2."how Much?"
Answer:
1. You get the plan scale 1:500 print 'Tatarstan urban architecture authority' 'Suitable to prenatt proekta,'
You will get a plan of scale 1:500 print 'Tatarstan urban architecture authority' 'Suitable to prenatt proekta,'
And also, the File with the drawing in electronic form(PDF, JPG, TIF).
Proof of its correctness will serve as our licenses and certificates, as well as tolerances to such activities. Quality is guaranteed by a number of our satisfied customers. Guild Engineering measures with a clearance of about 95 objects in the month, also works with 10 large organizations, the number of which is growing every month.
2. What survey price on it You can calculate online send the request for the rendering cost, and order a call back, or call at any convenient for you mobile and fixed-line numbers.

the Plan geodesy is the kind of plot of land on a horizontal plane with the reduced objects that it contains.

Survey allows you to create a digital model study area and to assess the conditions of the planned construction. The accuracy of work performed depends largely on the duration of operation of the future facility, the cost of construction works, as well as the safety of their stay.

Toaplan you can use:

  • when the pre-project surveys
  • design
  • when privatization (served on the session of the mountains. or mudflow. of the Board to resolve on acquisition of land)
  • when writing or extension of the lease
  • when the section of the site for a few in any procentowe
  • for commissioning new buildings and communications
  • for line test excavation and construction works

To start with, would not hurt passport BTI for the proper names of buildings according to their purpose (jilie non-residential), the project on the network and structure, or Executive survey on communication and underground parts of plants.

the Speed and quality of production of the project depends on the skills of surveyors and topographers. Only an experienced engineer, land surveyor can Orient yourself and to faithfully display all tehnicheskie the elements needed in subsequent investigations. Measuring masters transmit all data from the sketches, Executive circuits, memory devices, in the laboratory Department. From the surveyor-samerica depends on the phase of the field, the beauty and completeness of the map affects engineer-draftsman-cartographer. Its task by conventional signs and rules mapping to display all the data in one compact and conventional appearance. Also in the electronic version of the drawing to capture all the semantic data such as pipe material, diameter, depth wells, types of fences, characteristics of raw materials in pipes (for example, natural gas is low or high-pressure drinking water or technical).

The need for surveying arises in the design of the land and to conduct land operations. It is the basis for the design and documentation for the identification and restoration of land area, for connecting the object to electrical networks and gas pipeline, for ressenya disputes with neighbours, to obtain permits for design and construction and more. also topographic survey is carried out for landscaping. In this case, it is performed on a large scale. It allows you to get the most accurate information about the land, its topography, all hosted on its elements, real estate, underground and surface communications and more.

Topographical survey of communications includes:

  • preparation and analysis of previous surveys;
  • search utilities on the site;
  • survey of all existing utilities;
  • laboratory work (preparation of reports, design drawings, plans and diagrams);
  • coordination of topographic plans and schemes with operating organizations.

 

the Cost of surveying depends on such factors as:
- how urgent need to hold its execution;
- the amount of work done;
- what is the size of the plot;
- in what place it is.

On survey have the ability to put red lines and boundaries of land use.

Often it is ordered Geology of the site, the building project, technical report for land management, installation, breakdown axes for planting of the building.

Thank you, will be glad to cooperate!

Comments and questions:


Your questions, comments and suggestions You can leave here. We will definitely answer all Your appeals